Here's what the kitchen looks like as of now.
As far as details go, the cabinets are maple stained cinnamon, dovetailed drawers, all plywood construction by Blue Mountain Woodworking, Bath Pa. Kyle and Heather are really cool people and we really enjoyed working with them. The hardware came from them as well, although I don't know the manufacturer or names or anything. We also got the counters through their fabricator, The Marble Source. Kevin was also very nice to work with and did a really great job.
The only seam in the granite is at the faucet and it shows up way more in this picture then it does in real life. And the offset faucet was a fabulous idea (Thanks to my husband) as it's directly over the drain when I want it to be but easily swings out of the way so I can access the entire sink when needed.
And the sink is nothing short of a Godsend. This thing can fit an entire meal's worth of prep, cooking and eating dishes inside and I still have room to wash and rinse all the dishes without having to drain the sink halfway through. The only reason I'm handwashing dishes right now is because the dishwasher isn't hooked up yet (the only appliance that we haven't used yet). The floor has to go in first, but that's not happening until the painting is done. Right now the tiles are sitting in boxes in the middle of the room just waiting to be laid out on the floor.
And the paint is in the living room just waiting to get on the walls
And the pendant light is sitting upstairs in its box just waiting to be hung
Soon my little friends...soon you will be where you belong :)